Vostochny Launch-Vehicle Site
Defense line: the information is strictly confidential
Services performed: development, engineering, commissioning and the implementation of a central monitoring console of an automatic water and foam fire suppression system with the application of a blast resistant Robotized Fire Complex (RFC-Ex)
The fire suppression systems monitoring has been implemented on the site (the solution of FR Service company)
Project: the construction of the Vostochny Cosmodrome on the territory of the Amur Oblast - a cosmodrome that is designed for scientific, social and economic purposes
Client: Spetsstroy Russia, Federal Special Construction Agency
Hangar One and Two of the Aircraft Maintenance Department in “Sheremetyevo-1” International Airport
Defense line: two aircraft maintenance hangars, 10.000 sq.m in total area
Services performed: engineering, procurement, installation, commissioning, hot-fire testing and implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC), automatic fire alarm and mass notification control systems
The fire suppression systems monitoring has been implemented on the site (the solution of FR Service company)
Project: the renovation of automatic fire extinguishing systems in Hangar One and Two of the Aircraft Maintenance Department
Client: Aeroflot-Russian Airlines
Hangar Complex of the Aviation Technical Centre, Yekaterinburg International Airport
Defense line: an aircraft maintenance hangar, 7.000 sq.m in area
Services performed: commissioning, hot-fire testing and the implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Project: the construction of a detached hangar with an adjoining office and amenity building
Client: Ural Airlines
Aircraft Maintenance Hangar, Orenburg International Airport
Defense line: an aircraft maintenance hangar, 4.000 sq.m. in area
Services performed: procurement, commissioning of automatic fire alarm, mass notification and evacuation control systems, of a fire video monitoring and an automatic fire suppression system based on a Robotized Fire Complex (RFC)
Project: the construction of a BOEING 737 NG maintenance hangar
Client: Orenburg Airlines
Aircraft Hangar of the Republic of Belarus Administration
Defense line: an aircraft maintenance hangar, 17.000 sq.m in area
Services performed: commissioning, hot-fire testing and implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Project: the construction of a RUE National Airport Minsk aircraft hangar
Client: National Airport Minsk RUE
Aircraft Maintenance Hangar Three in “Sheremetyevo-1” International Airport
Defense line: an aircraft maintenance hangar, 5.000 sq.m in area
Services performed: commissioning, hot-fire testing and implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Project: the installation of an automatic fire extinguishing system in Hangar Three of the Aviation Technical Center (ATC)
Client: Aeroflot-Russian Airlines
Aircraft Hangar of the President of the Russian Federation, Vnukovo International Airport
Defense line: an aircraft maintenance hangar, 12.000 sq.m in area
Services performed: commissioning, hot-fire testing and the implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Project: the construction of a hangar complex of the State Transport Company “Rossiya” in Vnukovo Airport
Client: the Rossiya special aircraft division, the Presidential Administrative Directorate
The Ostafyevo International Business Airport Hangar Complex for Five Airplanes
Defense line: an aircraft maintenance hangar, 7000 sq. m in area
Services performed: commissioning, hot-fire testing and the implementation of an automatic water and foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Planned maintenance of the Robotized Fire Complex is performed on the site.
Project: the construction of a hangar complex for 5 planes with adjacent structures
Client: Gazpromavia Aviation Company
Integration and Test Facility
Defense line: the information is strictly confidential
Services performed: engineering, procurement, installation, commissioning, hot-fire testing and implementation of a foam fire suppression system with the application of a blast resistant Robotized Fire Complex (RFC-Ex)
Project: the infrastructure reconstruction of the Russian Northern Fleet Naval Base in Severomorsk
Client: Spetsstroy Russia, GUSST number three
Liquid Cargo Complex. Commercial Sea Port of Ust-Luga, Berths Four and Five
Defense line: two oil tankers during oil products loading
Services performed: commissioning, hot-fire testing and implementation of an automatic foam fire suppression system with the application of blast resistant remote control fire monitors (LSD-Ex)
Project: the construction of the commercial sea port of Ust-Luga
Client: Ust-Luga
Technical sulfur transshipment terminal, Commercial Sea Port of Ust-Luga
Defense line: a shipping conveyer and a sulfur storage yard with a total area of more than 17.000 sq.m
Services performed: commissioning, hot-fire testing and the implementation of an automatic foam fire suppression system with the application of a Robotized Fire Complex (RFC)
Project: the construction of the commercial sea port of Ust-Luga
Client: Ust-Luga
Primorsk Sea Oil-Loading Port
Defense line: four oil tankers loaded using open-type pump stations
Services performed: procurement, installation and commissioning of a blast resistant fire situation video monitoring of the loading berth
Project: the construction of Primorsk sea oil-loading port as a part of the Baltic Pipeline System
Client: Primorsk specialized oil-loading port (concern Transneft)
On-spot Loading Unit for Fuel Oil to Railway Cisterns (Novo-Yaroslavsky Oil Refinery)
Defense line: eight railway cisterns storing oil products
Services performed: commissioning and implementation of blast resistant remote control fire monitors (LSD-Ex) installed on fire towers
Project: the reconstruction of Yaroslavl Oil Refinery Plant
Client: Slavneft – YANOS
Railway Light-Oil Products Handling Facilities (Udarnik Complex)
Defense line: sixteen railway cisterns storing oil products
Services performed: engineering, procurement, installation, commissioning and implementation of blast resistant remote control fire monitors (LSD-Ex) installed on fire towers, blast resistant automatic fire alarm and mass notification control systems
The fire suppression systems monitoring has been implemented on the site (the solution of FR Service company)
Project: the reconstruction of the oil storage facilities
Client: Udarnik Complex (Rosrezerv)